Assessment item 3
Draft Design – Detailed PMP
Value: 25%
Due date: 12-Sep-2016
Return date: 06-Oct-2016
Submission method options
Alternative submission method
Task
Network Engineering / Systems administration
Solution Design Document (Draft) and Test Plan
The purpose of a Solution Design Document is to provide a thorough and complete description of your proposed solution.
It has to include the logical (network topology, addressing, naming, VLANs, VPNs etc) as well as the physical design (which equipment to use, chosen LAN and WAN technology etc) for solution and provide information on how the design is to be implemented (Installation plans, user guides, administration plans etc). The design decisions that you have made need to be justified by referring back to the customer requirements set out in the Requirements Specification. You will need to show how your proposed design is a valid solution to fulfill these requirements. An electronic copy of the templates for the Design Document can be found in the resources section of the ITC306 Interact site.
Test plan
The purpose of a test plan is to clearly document the testing parameters for the system you are building in order to ensure the system is accurately evaluated against the system requirements documented in Assessment Item 2.
IT Management /Business Analysis
You are required to submit:
Detailed Project Management Plan
An Updated detailed Project Management Plan that includes:
Quality Management plan
High level WBS and budget
Change Control plan
Reporting Templates
Templates for your team submissions including:
Change request forms
Change log,
Issue log,
Team meeting agenda and minutes
other templates as identified
Rationale
Network Engineering / Systems administration
Demonstrate student’s ability to apply appropriately the different steps in the project development, as well as develop the main artifacts of the process.
IT Management /Business Analysis
Demonstrate student’s ability to apply appropriately the different steps in the project development, as well as develop the main artifacts of the process.
Marking criteria
Network Engineering / Systems administration
Criteria
HD
DI
CR
PS
FL
Design matches documented project requirements (12)
Design correctly addresses all project requirements
Design correctly addresses most project requirements
Design correctly addresses all key project requirements
Design correctly addresses key project requirements
Design fails to correctly address key project requirements
Implementation plan matches documented project requirements (8)
Implementation plan would allow an IT professional to implement your design and meet all project requirements without any further clarifications
Implementation plan would allow an IT professional to implement your design and meet all project requirements with minimal clarifications
Implementation plan would allow an IT professional to implement your design and meet all project requirements with some minor clarifications
Implementation plan would allow an IT professional to implement your design and meet most project requirements with some minor clarifications
Implementation plan would not allow an IT professional to implement your design and meet most project requirements with some minor clarifications
Testing parameters for evaluation of system performance against business, functional and technical requirements are correctly identified and analysed (5)
Testing parameters will allow for accurate testing of all business, functional and technical requirements
Testing parameters will allow for accurate testing of most business, functional and technical requirements
Testing parameters will allow for accurate testing of key business, functional and technical requirements
Testing parameters will allow for accurate testing of essential business, functional and technical requirements
Testing parameters will not allow for accurate testing of one or more essential business, functional and technical requirements
IT Management /Business Analysis
Criteria
HD
DI
CR
PS
FL
PMP contains all required information (10)
Effectively builds upon supplied template to provide all relevant information
Supplied template is adapted to provide all requested information and additional relevant information
Supplied template is accurately completed with all requested information
Supplied template is accurately completed with most requested information
Supplied template not completed accurately or completely
PMP demonstrates effective written communication skills (5)
Consistent application of industry standard language and formatting
Well written with some demonstration of industry standard language and formatting
Well written with demonstration of academic standard language and formatting
Well written but lacks acceptable formatting
Writing is not of an acceptable standard.
Templates contain all required information and are clear, easy to use, consistent formatting (10)
All templates developed. Templates capture all relevant information. Well designed. Consistent application of industry standard language and formatting
Most or all templates developed. Templates capture most of the required information. Well designed with some demonstration of industry standard language and formatting
Most or some templates developed. Some design issues or inconsistencies. Written with some demonstration of industry standard language and formatting
Most or some templates developed. Design issues or inconsistencies. Not all relevant information captured.
Templates are not of an acceptable standard.
Requirements
Ask for additional documents if you will need dont guess anything
NO PLAGIARISM. I WANT DIAGRAMS AND HOW YOU ASSIGNED IP addresses.